NED EFFLUENT TREATMENT PLANT FOR KORANGI CREEK INDUSTRIAL PARK

Assignment from

National Industrial Parks Development and Management Company

Period of Assignment

2008- On going

Technical Assistance

National Industrial Parks Development and Management Company, Karachi



Korangi Creek Industrial Park (KCIP), a project of National Industrial Parks (NIP) Development and Management Company, with a gross area of about 250 Acres, is located at a travel distance of about 22 Kilometer, from Karachi Sea Port, Karachi. Presently different infrastructure facilities including roads, water supply works and sewerage and drainage works are being constructed at KCIP. NIP has decided to undertake, parallel to the other infrastructure facilities, the construction of a Combined Effluent Treatment Plant (CETP), for the estate, at an already allocated site, located in the north of the Park. The treatment capacity of plant is around 16,000 m3/day [3.55MGD]

COMPONENTS
1. Process Designing
2. Environmental Impact Assessment (EIA)
3. Preparation of Tender Documents
4. Preparation of Detail Construction Drawing
5. Supervision of Construction and Installation Drawings
6. Supervision of Commissioning and Training of Operation Staff
7. Post Commissioning Back Support.