Faisalabad Industrial Estate Development & Management Company (FIEDMC), with a gross area of about 1523 hectares, is located adjacent to M-3 Motorway at a distance of 22KM from Faisalabad. FIEDMC has decided to undertake, parallel to the other infrastructure facilities, the construction of a Combined Effluent Treatment Plant (CETP) and Solid Waste Management, for the estate, at an already allocated site. The treatment capacity of plant is around 400,000 m3/day. The proposed Combined Effluent Treatment Plant Site with an area of 24.84 hectares is designated within the estate. |
COMPONENTS |
1. Basic Secondary Data Collection |
2. Physical and topographical surveys |
3.Subsoil surveys and geo-technical Investigation |
4. Feasibility Study Report |
5. Initial Environmental Examination |
6. Detailed Engineering design and tender-contract documents |
6. Tender contract documents |
7. Engineer’s Cost Estimate |
8. Process Design Report |
9. Construction Drawings |
10. Operational and Maintenance Manual |
11. In-house Pollution Reduction Measures (IPRM) Guideline Manual |
11. Contractor’s Pre-qualification Services |
12. Bid Evaluation Services |
13. Construction Supervision Services |
14. Supervision of Plant Start-up and Commissioning |
15. Solid Waste Management Scheme |